2016-11 Fall Maintenance
This wikilog article is a draft, it was not published yet.
Maintenance Activities completed in Oct & Nov 2016:
- Air Filter- Front: Replaced, old filter was taped to the grating. New filter installed without tape.
- Air Filter- Classroom: Replaced
- Lights- Classroom: Several fluorescent tubes replaces. Several seem to have bad ballasts.
- Toilet: Running Toilet found to have a cracked drain tube. Replaced drain tube. Replaced fill valve. Tank has couple of inches of space betwen the tank and wall. It seems that drain tube cracked caused by someone leaning against the tank. Need get some spacer brackets to install between tank and wall.
[ List view ]Comments
Please login to comment.