Difference between revisions of "User:Ryan"

From The Maker Station Wiki!
Jump to: navigation, search
(Wood Shop Prep)
Line 1: Line 1:
Maker of things. Chasing geese and finding ducks.
+
Chasing geese and finding ducks. Co-Director and general doer of things.
  
 
==Mostly Encompassing Inconclusive List==
 
==Mostly Encompassing Inconclusive List==

Revision as of 07:58, 15 June 2023

Chasing geese and finding ducks. Co-Director and general doer of things.

Mostly Encompassing Inconclusive List

Metal Shop Construction

- Divider ○ Finish bolting ○ Deck upper shelves - Electrical ○ A: Green workstation 2-gang, Orange rack 2x 2-gang 110v, Exit Sign ○ B: Side Concrete wall, 2x 2-gang 110v ○ C: Dedicated Lathe/Mill 110v ○ D: Overhead outlet, lighting ○ D: 220v Dedicated Concrete wall ○ Subpanel cross connect - Modify center bench - Welder Bullpen - Blast Cabinet - English Wheel/Pipe Bender mount - Install metal light

Laser

- Vent pipe - Blower mounting - Dedicated 20A for Laser + Blower ○ Junction to outlet drop ○ Panel to Junction - Dedicated 20A for chiller + comp ○ Junction to outlet drop ○ Panel to Junction - Catwalk for maintenance

Metal Shop Migration

- Tool Boxes ○ Consolidate tools into the gray rolling toolbox - Rolling Tools ○ Roll tools over to metal shop near rough locations

Mechanisms

- Walls ○ 10' 4-1/2" square with hallway side having 18" partial walls ○ Frame out corner - Electrical ○ 3 2-gang outlets in office, 1 overhead ○ 8' Led light from ceiling, outlet with switch.

Wood Shop Prep

* Encapsulation ** Upper Wall in Metal Shop ** Moving lights over - Sanding Bench ○ Shorten so spindle tops are about 38" ○ Change up storage layout - Jointer

- Planer ○ Combine 220v and 110v cables ○ Cable wrap - Lathes ○ Break down old laser stand and store lathe ○ Shrink other lathe bench - Tool Bench ○ Kill arm of U-Bench ○ Reorganize Ryobi tools ○ Label bins underneath - Dust Collection ○ Move central controller to upright by heavy tools ○ Move Blue controller near CNC ○ Move dust collectors physically ○ Add 3HP control box ○ Finish sealing pipe ○ Run control wires ○ Build control panel § "tree" for each gate § Green/Red lights for power ○ Run overhead pipe for drywall side ○ 3HP under pallet rack for heavy tools, saws, and sanding ○ 2HP for CNC - Air System ○ Move and mount compressor ○ Run pipe to metal shop § Drop by Mech CNC § Drop on far side of Lathe

○ Run pipe along first overhead rail on woodshop side § Drop by compressor corner § Drop by edge of heavy tools § Drop by back door (low) - Electrical Changes ○ Move SawStop forward and add new motor cable (blocked by aluminum) ○ Center wood shop lights ○ Add Compressor circuit ○ Add 220v 6-20R to upright with control box ○ Add addl' 4' lights § 1 Above member storage § 2 Above Logo § 2 Above CNC § 1 on Bret bench ○ Add 3 electrical boxes on new circuit on roof for fans. - Layout ○ Move Worktables ○ Stack Workstations ○ Pile shelves in Mechanism's office for now - Storage ○ Miter Wood Rack ○ Organization of storage shelves ○ Dump of crap from storage room ○ Set up new scrap storage § 2x4' shelf in storage area for small flat stock § 4' deep short boards ○ Break down aluminum ○ Mezzanine § Deck above member storage with OSB § Catwalk across front wall § Tear down hang printer frame - Other ○ Ceiling Fans ○ 6-7' fans, 3 total ○ One over CNC area ○ One over Miter ○ One behind heater