Maker of things. Chasing geese and finding ducks.
+
Chasing geese and finding ducks. Co-Director and general doer of things.
  
==Mostly Encompassing Inconclusive List==
+
==Mostly Inconclusive Encompassing List of Endless Tasks==
 
===Metal Shop Construction===
 
===Metal Shop Construction===
- Divider
+
*Divider
Finish bolting
+
**<s>Finish bolting</s>
Deck upper shelves
+
**Deck upper shelves
- Electrical
+
*Electrical
A: Green workstation 2-gang, Orange rack 2x 2-gang 110v, Exit Sign
+
**A: <s>Green workstation 2-gang, Orange rack 2x 2-gang 110v, Exit Sign</s>
B: Side Concrete wall, 2x 2-gang 110v
+
**B: <s>Side Concrete wall, 2x 2-gang 110v</s>
C: Dedicated Lathe/Mill 110v
+
**C: <s>Dedicated Lathe/Mill 110v</s>
D: Overhead outlet, lighting
+
**D: <s>Overhead outlet, lighting</s>
○ D: 220v Dedicated Concrete wall
+
**E: 220v Dedicated Concrete wall
Subpanel cross connect
+
**F: 110v back wall *wip*
- Modify center bench
+
**<s>Subpanel cross connect</s>
- Welder Bullpen
+
*Modify center bench
- Blast Cabinet
+
*<s>Welder Bullpen</s>
- English Wheel/Pipe Bender mount
+
*<s>Blast Cabinet</s>
- Install metal light
+
*English Wheel/Pipe Bender mount
 +
*Install metal lights
  
 
===Laser===
 
===Laser===
- Vent pipe
+
*<s>Vent pipe</s>
- Blower mounting
+
*<s>Blower mounting</s>
- Dedicated 20A for Laser + Blower
+
*<s>Dedicated 20A for Laser + Blower</s>
Junction to outlet drop
+
**<s>Junction to outlet drop</s>
Panel to Junction
+
**<s>Panel to Junction</s>
- Dedicated 20A for chiller + comp
+
*<s>Dedicated 20A for chiller + comp</s>
Junction to outlet drop
+
**<s>Junction to outlet drop</s>
Panel to Junction
+
**<s>Panel to Junction</s>
- Catwalk for maintenance
+
*Catwalk for maintenance
===Metal Shop Migration===
+
 
- Tool Boxes
+
===Metal Shop===
Consolidate tools into the gray rolling toolbox
+
*Tool Boxes
- Rolling Tools
+
**Consolidate tools into the gray rolling toolbox
Roll tools over to metal shop near rough locations
+
**Organize Husky toolbox if it's ours
 +
**Re-use Grey Tool Box for lathe tools/parts
 +
*Rolling Tools
 +
**Roll tools over to metal shop near rough locations
 +
*Walls
 +
**Peg board for common tools
 +
**Bullpen for 18v tools
 +
*Bench Grinders
 +
**Assemble stands and grinders in proper location.
 +
*Metal Storage
 +
**Small sheet cubbies(12"x36",24"x36")
 +
**Small bar cubbies( 3"x36")
 +
**Oversize Storage (?"x?")
 +
**Small parts bins
 +
***Aluminum
 +
***Steel
 +
***Alloys (brass/bronze/etc)
 +
***Aluminium (Metric aluminum)
 +
 
 
===Mechanisms===
 
===Mechanisms===
- Walls
+
*Walls
10' 4-1/2" square with hallway side having 18" partial walls
+
**<s>10' 4-1/2" square with hallway side having 18" partial walls</s>
Frame out corner
+
**<s>Frame out corner</s>
- Electrical
+
**Drywall
3 2-gang outlets in office, 1 overhead
+
*Electrical
8' Led light from ceiling, outlet with switch.  
+
**Drop from ceiling
 +
**3 2-gang outlets in office, 1 overhead
 +
**<s>8' Led light from ceiling, outlet with switch.</s>
 +
 
 
===Wood Shop Prep===
 
===Wood Shop Prep===
- Encapsulation
+
* Encapsulation
Upper Wall in Metal Shop
+
** Upper Wall in Metal Shop
Moving lights over
+
** Moving lights over
 
- Sanding Bench
 
- Sanding Bench
 
○ Shorten so spindle tops are about 38"
 
○ Shorten so spindle tops are about 38"

Latest revision as of 08:09, 15 June 2023

Chasing geese and finding ducks. Co-Director and general doer of things.

Mostly Inconclusive Encompassing List of Endless Tasks

Metal Shop Construction

  • Divider
    • Finish bolting
    • Deck upper shelves
  • Electrical
    • A: Green workstation 2-gang, Orange rack 2x 2-gang 110v, Exit Sign
    • B: Side Concrete wall, 2x 2-gang 110v
    • C: Dedicated Lathe/Mill 110v
    • D: Overhead outlet, lighting
    • E: 220v Dedicated Concrete wall
    • F: 110v back wall *wip*
    • Subpanel cross connect
  • Modify center bench
  • Welder Bullpen
  • Blast Cabinet
  • English Wheel/Pipe Bender mount
  • Install metal lights

Laser

  • Vent pipe
  • Blower mounting
  • Dedicated 20A for Laser + Blower
    • Junction to outlet drop
    • Panel to Junction
  • Dedicated 20A for chiller + comp
    • Junction to outlet drop
    • Panel to Junction
  • Catwalk for maintenance

Metal Shop

  • Tool Boxes
    • Consolidate tools into the gray rolling toolbox
    • Organize Husky toolbox if it's ours
    • Re-use Grey Tool Box for lathe tools/parts
  • Rolling Tools
    • Roll tools over to metal shop near rough locations
  • Walls
    • Peg board for common tools
    • Bullpen for 18v tools
  • Bench Grinders
    • Assemble stands and grinders in proper location.
  • Metal Storage
    • Small sheet cubbies(12"x36",24"x36")
    • Small bar cubbies( 3"x36")
    • Oversize Storage (?"x?")
    • Small parts bins
      • Aluminum
      • Steel
      • Alloys (brass/bronze/etc)
      • Aluminium (Metric aluminum)

Mechanisms

  • Walls
    • 10' 4-1/2" square with hallway side having 18" partial walls
    • Frame out corner
    • Drywall
  • Electrical
    • Drop from ceiling
    • 3 2-gang outlets in office, 1 overhead
    • 8' Led light from ceiling, outlet with switch.

Wood Shop Prep

* Encapsulation ** Upper Wall in Metal Shop ** Moving lights over - Sanding Bench ○ Shorten so spindle tops are about 38" ○ Change up storage layout - Jointer

- Planer ○ Combine 220v and 110v cables ○ Cable wrap - Lathes ○ Break down old laser stand and store lathe ○ Shrink other lathe bench - Tool Bench ○ Kill arm of U-Bench ○ Reorganize Ryobi tools ○ Label bins underneath - Dust Collection ○ Move central controller to upright by heavy tools ○ Move Blue controller near CNC ○ Move dust collectors physically ○ Add 3HP control box ○ Finish sealing pipe ○ Run control wires ○ Build control panel § "tree" for each gate § Green/Red lights for power ○ Run overhead pipe for drywall side ○ 3HP under pallet rack for heavy tools, saws, and sanding ○ 2HP for CNC - Air System ○ Move and mount compressor ○ Run pipe to metal shop § Drop by Mech CNC § Drop on far side of Lathe

○ Run pipe along first overhead rail on woodshop side § Drop by compressor corner § Drop by edge of heavy tools § Drop by back door (low) - Electrical Changes ○ Move SawStop forward and add new motor cable (blocked by aluminum) ○ Center wood shop lights ○ Add Compressor circuit ○ Add 220v 6-20R to upright with control box ○ Add addl' 4' lights § 1 Above member storage § 2 Above Logo § 2 Above CNC § 1 on Bret bench ○ Add 3 electrical boxes on new circuit on roof for fans. - Layout ○ Move Worktables ○ Stack Workstations ○ Pile shelves in Mechanism's office for now - Storage ○ Miter Wood Rack ○ Organization of storage shelves ○ Dump of crap from storage room ○ Set up new scrap storage § 2x4' shelf in storage area for small flat stock § 4' deep short boards ○ Break down aluminum ○ Mezzanine § Deck above member storage with OSB § Catwalk across front wall § Tear down hang printer frame - Other ○ Ceiling Fans ○ 6-7' fans, 3 total ○ One over CNC area ○ One over Miter ○ One behind heater